What happens here

The host concludes the day's work, acknowledging that it was a much bigger undertaking than initially anticipated, partly due to the long distances materials had to be hauled. He reiterates the need to clear the area for the "mega shop," which he describes as a 50x112 foot building. He also points out a smaller 26x36 foot existing building that needs to be moved to make space. He expresses excitement about future projects, including building a deck on the top story of the new shop for views of the Blue Ridge Mountains (Floyd and Stuart, Virginia) and continuing extensive fence construction. Despite the long hours and upcoming cold weather, he remains optimistic about the weeks of work ahead.

Goal: Summarize the day's achievements and discuss upcoming farm development plans.

Tools and materials

  • Gehl RT210 Skid Steer Loader Gehl — Primary tool for the day's material relocation tasks
  • Pallet Forks — Primary attachment used for lifting and moving materials
  • Existing Building — Relocation to clear space for the new 'mega shop'
  • Fence Building Material Tornado Wire — Building new fences
  • Logs and Debris N/A — Clearing the future shop site