Skip to main content

Secure Blocks and Continue Backfilling

12:22
13:43
63.7K views

At 12:22 in

Starting a new hardscaping job- pt1

What happens here

Once the initial courses of retaining wall blocks are in place and accurately leveled, they are secured using an adhesive specifically designed for retaining wall blocks. This prevents shifting and enhances the long-term stability of the wall. Following this, the team prepares to continue backfilling the interior of the patio structure with more Class 5 material. This sequential process of laying blocks, securing them, and backfilling ensures a robust and stable foundation for the overlying paver layers.

Goal: The laid retaining wall blocks are secured with adhesive, and the backfilling process continues with additional Class 5 material to build up the patio's sub-base.

Tools and materials

  • Adhesive Gun
  • Class 5 Gravel
  • Retaining Wall Block Adhesive

What they say

Hide

so this first course here is all good to go next step we're going to glue all this down flames out getting uh more geo grid because we ran out uh so while he's gone we're gonna glue all this we're gonna get all these glued down are we gonna glue them down sam and then uh start filling in with class five and then hopefully he should be back by then and we'll get the next course on and uh just keep jamming are we going to glue that course down sam

Auto-generated from the video audio.