Laying Paver Base and Installation
At 0:25 in
Squeeze those lemons. #pavers #backyard
What happens here
With the retaining walls and steps in place, the next task is to prepare the final base for the patio pavers. This involves adding a layer of bedding sand over the compacted sub-base, typically 1 inch deep, which is then screeded to a precise, consistent grade. This sand layer provides a cushion for the pavers and allows for fine adjustments to their level. The selection of pavers is crucial for the aesthetic; the video shows large rectangular light-colored pavers that give a modern and spacious feel. These pavers are laid in a pattern, carefully spaced, and checked for levelness across the entire patio surface.
Goal: Install the chosen pavers to create the finished patio surfaces for all levels.
Tools and materials
- Bedding Sand — Providing a level and cushioning layer for the pavers
- Hearing Protection — Protecting ears when using power saws
- Patio Pavers — Creating the walking surface of the patio
- Paver Cutter or Wet Saw — Cutting pavers to fit edges and around obstacles
- Rubber Mallet — Tapping pavers into place and adjusting their level
- Safety Glasses — Protecting eyes during paver cutting
- Screed Boards — Leveling the bedding sand to a uniform thickness