Skip to main content

Laying Paver Base and Installation

0:25
0:45
719 views

At 0:25 in

Squeeze those lemons. #pavers #backyard

What happens here

With the retaining walls and steps in place, the next task is to prepare the final base for the patio pavers. This involves adding a layer of bedding sand over the compacted sub-base, typically 1 inch deep, which is then screeded to a precise, consistent grade. This sand layer provides a cushion for the pavers and allows for fine adjustments to their level. The selection of pavers is crucial for the aesthetic; the video shows large rectangular light-colored pavers that give a modern and spacious feel. These pavers are laid in a pattern, carefully spaced, and checked for levelness across the entire patio surface.

Goal: Install the chosen pavers to create the finished patio surfaces for all levels.

Tools and materials

  • Bedding Sand — Providing a level and cushioning layer for the pavers
  • Hearing Protection — Protecting ears when using power saws
  • Patio Pavers — Creating the walking surface of the patio
  • Paver Cutter or Wet Saw — Cutting pavers to fit edges and around obstacles
  • Rubber Mallet — Tapping pavers into place and adjusting their level
  • Safety Glasses — Protecting eyes during paver cutting
  • Screed Boards — Leveling the bedding sand to a uniform thickness