Skip to main content

Final Excavation and Base Preparation Overview

0:35
0:47
1.2K views

At 0:35 in

SO MANY PALLETS #paverdriveway #hardscape

What happens here

After the main excavation is nearly complete, the Kubota skid steer continues to refine the cleared area. The narrator states that the next step will be to bring in 'stone' (likely referring to the base material like gravel or crushed aggregate) to fill the excavated space. This base material is crucial for providing a stable and well-draining foundation for the pavers. Following the base installation, the team will begin laying the new clay pavers. The video also indicates where a bluestone landing will be placed to connect the existing walkway and the new driveway.

Goal: Complete excavation and prepare for the sub-base and paver installation

Tools and materials

  • Kubota SVL 75 Skid Steer Loader Kubota — Final clearing and grading of the excavated area
  • Orange Traffic Cone Unspecified — Marking hazardous areas or directing traffic around the construction zone
  • Gravel/Crushed Aggregate Unspecified — Creating the stable sub-base for the pavers