Stage Materials & Build Main Deck Frame
At 0:34 in
Small Deck Gets MASSIVE Makeover! - Full Build Time Lapse
What happens here
Upon delivery, organize and stage all lumber materials for the deck framing. This includes large beams for the main structure and smaller joists. Then, begin assembling the main deck frame. This involves attaching ledger boards to the house, securing the main support beams to the helical piles, and installing the joists across the beams. Ensure proper spacing and secure fastening of all components to create a strong and level sub-structure for the deck boards. Utilize a variety of fasteners and metal connectors for maximum stability and adherence to building codes. Some lumber, particularly deck boards and top rails, may be pre-stained or pre-treated for weather resistance.
Goal: Construct the robust sub-structure of the deck
Tools and materials
- Circular Saw — Cutting lumber to size
- Cordless Drill DeWalt — Driving screws and drilling pilot holes
- Impact Driver DeWalt — Driving larger fasteners
- Level — Ensuring the frame is level and plumb
- Measuring Tape — Accurate measurements
- Metal Joist Hangers — Providing stronger connections for joists to beams
- Pressure-Treated Lumber — Main support beams for the deck
- Wood Screws — Fastening lumber components
- Wood Stain/Sealer — Pre-treating lumber for weather resistance (visible on red-brown lumber)