Skip to main content

Terminate Service Cable in Electric Meter Box

0:33
0:55
30K views

At 0:33 in

Service Call, How to install a new 200 AMP Service #electrician #bluecollar

What happens here

With the service cable routed down into the electric meter enclosure, the electrician proceeds to terminate the conductors. This involves connecting the prepared ends of the 'hot' conductors to their respective main lugs and the neutral conductor to its dedicated neutral lug within the meter box. A crucial step, especially for aluminum conductors as shown, is to apply an anti-oxidant compound like 'Noalox' to the exposed bare wires before clamping them into the lugs. This compound prevents oxidation, which can lead to increased resistance, heat, and potential connection failure. All connections must be tightened to the manufacturer's specified torque settings to ensure a secure and reliable electrical bond.

Goal: Connect the service conductors to the appropriate terminals within the meter base enclosure.

Tools and materials

  • Insulated Screwdriver Set — Tightening the terminal lugs within the meter box
  • Torque Wrench — Ensuring terminal lugs are tightened to manufacturer specifications, preventing overtightening or undertightening

What they say

Hide

this new service cable is prepped and ready putting new service cable on update on the service we just got it strapped all right service came terminating inside the electric meter put that don't forget NOS put that gunky all terminated got two HS in the neutral last step wire bugging the service look at that the two HS and the neutral all bugged up let's get it

Auto-generated from the video audio.