Mount Sub Panel and Run Circuits
0:32
1:00
4.8K views
At 0:32 in
Service Call, Customer wants a Sub Panel upgrade for EV #electrican #bluecollar
What happens here
Mount the new sub-panel securely to the wall in the desired location. Once mounted, carefully run all existing circuit wires and any new wires (such as those for the EV charger and GEN inlet) into the new sub-panel enclosure. Ensure that enough wire length is pulled into the box for proper termination. Inspect all wires for any damage during the pulling process.
Goal: Securely install the new sub-panel and route all necessary circuit wires into it.
Tools and materials
- New Sub-panel — The electrical panel being installed
- Power Drill — Mounting the sub-panel to the wall
- Screws/Anchors — Securing the sub-panel to the wall
- Wire — Connecting new loads like EV charger and GEN inlet
What they say
(518 characters)Hide
What they say
(518 characters)Auto-generated from the video audio.