Skip to main content

Lift Preparation and Initial Ascent

0:00
0:50
6.6K views

At 0:00 in

Send it

What happens here

The video begins with a large mobile crane positioned on site, rigged with heavy-duty lifting straps attached to a pre-fabricated swimming pool. The crane operator begins to lift the pool from its initial staging area. Ground personnel are seen in the distance, ready to assist with guiding the load. The narrator confirms that the pool is 'up in the air' and the straps are 'slacked up,' indicating the initial tensioning and stabilization of the load.

Goal: Securely lift the pool off the ground and stabilize the load.

Tools and materials

  • Heavy-Duty Lifting Straps — Securing the swimming pool to the crane's hook
  • Mobile Crane — Lifting and maneuvering the heavy swimming pool
  • Pre-fabricated Swimming Pool — The primary item being lifted and installed