Remove Screed Pipes from Leveled Base
0:03
0:14
2.1K views
At 0:03 in
SCREEDED. #paverpatio #unilock #hardscape
What happens here
After the crushed stone base material (referred to as 'chips') has been thoroughly spread, compacted, and precisely leveled to the desired grade, the screed pipes that were used as temporary guides for this leveling process are carefully removed. This step requires a worker to bend down and methodically pull each pipe out of the prepared base, taking care not to disturb the newly leveled and smoothed surface. The accompanying voiceover confirms that "the base is laid and the chips all smoothed out," signaling that the foundation is meticulously prepared and ready for paver installation.
Goal: Clear the leveled base of all temporary leveling guides.
Tools and materials
- Crushed Stone Base — The foundation layer beneath the pavers, providing stability and drainage
- Screed Pipes — Temporary guides for leveling the base material