Final Clearing and Site Leveling
7:08
11:20
54.5K views
At 7:08 in
Sam is Kicked off the Job
What happens here
After a crew member was stung by wasps, he was removed from the site for safety. The remaining crew continues to manage the site preparation. This involves the skid-steer operator meticulously clearing remaining debris, such as railroad ties, and further leveling the terrain. The goal is to ensure a completely cleared and properly graded area, ready for the installation of the retaining wall, as discussed in the later segments of the video.
Goal: Achieve a fully cleared and leveled site for retaining wall construction.
Tools and materials
- Dump Truck Dirt Monkey — Final removal of remaining debris from the site
- Ground Crew N/A — Assisting with debris removal and site cleanup
- Skid-Steer Forks Attachment ASV — Moving any remaining larger debris