Complete Remaining Trenching Sections
0:31
0:48
7K views
At 0:31 in
Ripping pool utility lines. #hardscape #paverpatio #landscaping #construction #ditchwitch
What happens here
Continue operating the Ditch Witch C16X trencher to complete any remaining sections of the utility trenches, extending them to their final destinations, such as the designated location for the pool equipment pad. The video shows the trencher finishing a long run, demonstrating the machine's ability to create extended trenches efficiently and effectively. Once all planned trenches are dug to the required depth and length, the trenching portion of the project is complete, and the site is prepared for the full installation of utility conduits and pipes.
Goal: Finish all planned trenching for utility installation.
Tools and materials
- Ditch Witch C16X Trencher Ditch Witch — Completing all remaining trenching