Skip to main content

Apply Epoxy to Second Mantelpiece

13:06
19:39
62K views

At 13:06 in

Repairing a Bad Epoxy Pour

What happens here

Repeat the mixing, pouring, spreading, and torching steps for the second live edge mantelpiece. The process is identical to the countertop application. The presenter emphasizes the importance of thorough mixing for four minutes, pouring in an S-pattern, spreading with a brush to cover all surfaces, and then immediately torching to eliminate bubbles. This ensures both pieces receive a consistent, high-quality epoxy topcoat.

Goal: Apply epoxy to the second mantelpiece following the same steps: mix, pour in S-pattern, spread with a brush, and torch for bubbles.

Tools and materials

  • Mixing Buckets
  • Mixing Sticks
  • Paint Brush
  • Propane Torch

What they say

Hide

these two all right it's time to pour the mantle this is where we get it over all the ends we brush on the ends whiskeys [Music]

Auto-generated from the video audio.