Attach and Test the Power Rake
At 5:17 in
Regrading the WORST yard I've seen. day1
What happens here
The crew unloads a power rake from a separate trailer. The operator expresses concern about the size of the power rake (8 feet wide, 9 feet with attachments), noting it barely fits on the trailer and is too wide for the front of the trailer alongside other equipment. He prepares to attach it to the skid steer, emphasizing the importance of securing the hydraulic hoses. After attachment, he performs a full functionality test, demonstrating the smooth operation of the power rake, highlighting its high-flow optimization for the CAT 259D skid steer. He briefly mentions the strength of the Dalton hydraulic cylinders.
Goal: Successfully attach the power rake and verify its operational functionality.
Tools and materials
- CAT 259D Skid Steer Loader Caterpillar — Operating and moving attachments
- Dalton Hydraulic Cylinders Dalton — Actuating the power rake's functions
- Hydraulic Hoses — Connecting the power rake to the skid steer's hydraulic system
- Power Rake MIW — Grading, raking, and preparing soil
- Trailer PJ — Transporting the power rake
What they say
(2,081 characters)Hide
What they say
(2,081 characters)Auto-generated from the video audio.