Skip to main content

Excavation and Retaining Wall Construction

0:15
0:44
4.9K views

At 0:15 in

raised in-ground pool/patio #hardscape #paverpatio

What happens here

To accommodate the elevated patio, significant excavation is required to create a stable foundation for the retaining wall and the paver base. After initial excavation, a compacted gravel base is laid. The video shows a partially constructed retaining wall, which the presenter explains borders 'pretty much the entire thing.' This wall is critical for defining the elevated patio space, retaining the fill material, and creating the necessary height to match the pool deck. Construction of the retaining wall involves laying individual blocks with appropriate adhesive or mortar on a level, compacted footing.

Goal: Create a stable base and build the perimeter retaining wall.

Tools and materials

  • Level — Ensuring retaining wall blocks are laid straight and level
  • Pickaxe — Breaking up compacted soil or rocky ground
  • Plate Compactor — Compacting soil and gravel layers for the base
  • Retaining Wall Adhesive/Mortar — Securing retaining wall blocks together
  • Retaining Wall Blocks — Building the structural retaining wall
  • Safety Glasses — Protecting eyes during excavation and block cutting
  • Shovel — Manual excavation and spreading of materials
  • Wheelbarrow — Transporting excavated soil and aggregate materials
  • Work Gloves — Protecting hands during material handling and construction
  • Crushed Gravel — Creating a stable sub-base for the patio and backfill for the retaining wall