Spreading and Preparing Aggregate Sub-base

0:00
0:31
710 views

At 0:00 in

pour ready. #concrete #construction #skidsteer

What happens here

The video illustrates the process of preparing the interior floor of a new building for a concrete slab. A compact track loader, specifically a 'Creekside' branded model, is utilized to efficiently spread a layer of aggregate material, likely gravel or crushed stone, across the entire floor area. This material serves as a sub-base for the concrete. The operator skillfully maneuvers the machinery to distribute the aggregate, including backfilling areas around features like an 'oil catch basin'. The narrator indicates that after this spreading, the aggregate will be compacted before the concrete company begins pouring. The final concrete slab is planned to be 6 inches deep in some sections and 4 inches deep in others, highlighting the need for precise sub-base preparation.

Goal: Evenly spread and prepare the aggregate layer for concrete pouring

Tools and materials

  • Aggregate Material — Creating the sub-base layer for the concrete slab, providing drainage and stability
  • Compact Track Loader Creekside — Spreading aggregate material across the floor area efficiently
  • Compactor
  • Oil Catch Basin — A drainage component being backfilled with aggregate (already installed)