Install Riprap Spillway
17:09
21:03
93.5K views
At 17:09 in
Pond Mucking + Giant Water scorpion + Excavator = Todays Video
What happens here
After clearing muck from a specific section of the pond bank, a layer of geotextile fabric is laid down. Large, irregularly shaped rocks, referred to as riprap, are then carefully placed on top of the fabric using the excavator bucket to create a stable spillway. This structure is designed to prevent erosion of the bank, especially where water may flow in or out of the pond. Excess soil is used to create a gradual slope around the riprap.
Goal: A riprap spillway is installed at a designated pond edge to provide erosion control and manage water overflow, using geotextile fabric and carefully placed stones.
Tools and materials
- Daewoo 75V Mini-Excavator
- Geotextile fabric
- Riprap stones
What they say
(371 characters)Hide
What they say
(371 characters)Auto-generated from the video audio.