Site Excavation (Digout Phase)
0:00
0:38
655 views
At 0:00 in
Phase 2: walkway. #hardscape #paverpatio
What happens here
This step showcases the main activity of the video: the excavation or "digout" of the terrain where the stepped walkway will be built. Workers are actively removing soil using both heavy machinery, specifically a compact track loader, for bulk earth removal, and manual shovels for more precise shaping and clearing along the house and around trees. The goal is to create the necessary depth and contour for the walkway's base, accounting for the planned steps and overall elevation changes. The removed soil is piled up nearby.
Goal: Remove soil and rough-grade the area for the stepped walkway foundation.
Tools and materials
- Compact Track Loader N/A — Bulk soil removal and earth moving
- Shovel N/A — Detailed excavation, shaping edges, and clearing areas inaccessible to machinery
- Soil N/A — Material being removed from the excavation site