What happens here
After the initial preparation of the sub-base, the walkway is now fully based and ready for the installation of the clay pavers. This step emphasizes that the groundwork, including excavation, grading, and compaction of aggregate material, has been completed, creating a stable and well-drained foundation. The next phase will involve laying the pavers on a sand setting bed. The project leader notes that the actual paver laying will commence soon.
Goal: Confirm the walkway base is complete and ready for paver installation.
Tools and materials
- Aggregate Base Material — The compacted layer forming the foundation of the walkway