Constructing the Main Joist Framework
0:05
0:17
8.7K views
At 0:05 in
Nothing better than a tight frame 🔥
What happens here
With the ledger board in place, the main joist framework of the deck is constructed. This involves installing the outer rim joists, inner support beams, and a series of parallel joists that run between the ledger and the outer rim joist or main beams. Workers are seen meticulously cutting lumber to size, positioning it, and fastening it together. This phase typically uses joist hangers and various nails or screws to create a strong, level, and square structure.
Goal: Assemble the complete structural skeleton of the deck.
Tools and materials
- Circular Saw — Cutting lumber to precise lengths
- Drill/Driver Makita — Pre-drilling holes or driving screws
- Framing Nailer — Fastening joists and beams together
- Joist Hangers Simpson Strong-Tie — Providing strong connections between joists and beams
- Level — Ensuring all framework components are level
- Lumber — Building the main structural framework
- Measuring Tape — Accurate measurement of lumber lengths and spacing
- Safety Glasses — Eye protection during cutting and fastening
- Speed Square — Marking accurate 90-degree cuts and angles
- Nails/Screws — Fastening wood components together