Assess First Water Tank and Gather Tools
0:00
30:27
19.9K views
At 0:00 in
Normal Day of Farm Chores turns into GOVERNMENT PHOTOGRAPHY OVER THE FARM!
What happens here
The video begins with the farmer gathering tools from his ATV. He then drives the ATV to the pasture where the first water tank needs repair. The tank is a Mirafount 3390, which is currently leaking, creating a muddy wallow around it. He opens the top access panel of the water tank using a Milwaukee M12 FUEL right angle ratchet with an appropriate socket, revealing the internal float valve mechanism.
Goal: Identify the leaking water tank and prepare for repair.
Tools and materials
- ATV — Transportation around the farm and carrying tools
- Socket Set — To fit the bolts on the water tank
- Toolbox/Organizer Milwaukee Packout — Storing and transporting various tools