Prepare Site and Equipment for Winter Work
At 0:00 in
Nope-Back to Losing money on this Job....
What happens here
Before commencing work in sub-freezing temperatures, it is crucial to prepare all materials and equipment to prevent freezing and ensure proper operation. This involves physically clearing ice from concrete blocks using manual tools like a hammer and chisel (or a putty knife), and utilizing propane torches to thaw frozen surfaces and materials. Additionally, cold-starting heavy machinery, such as excavators and skid steers, requires significant time and effort, emphasizing the need for robust cold-weather operational procedures and potentially specialized fluids or pre-heating systems to protect hydraulic components from initial strain.
Goal: This step involves preparing the work site and heavy equipment for operation in freezing temperatures, focusing on methods to thaw materials and ensure machine functionality.
Tools and materials
- Chisel/Putty Knife
- Concrete Blocks
- De-icer/Warm Liquid
- Hammer
- Propane Torch
- Roller Brush
What they say
(1,022 characters)Hide
What they say
(1,022 characters)Auto-generated from the video audio.