Skip to main content

Preserve Topsoil for Final Grading

3:56
24:37
162.2K views

At 3:56 in

Noob Tries his hand at Cutting Grade & running his first 4 in 1 bucket -Can he handle it? 4k video

What happens here

The instructor steps out of the machine to explain the concept of different soil layers: topsoil (referred to as the 'top coat' or 'top layer') and subsoil (the soil underneath). He emphasizes that for this job, it's crucial to conserve the valuable topsoil, which was previously imported. The plan is to skim off the top 1/8 to 1/4 inch of topsoil, pile it outside the immediate work zone, and then spread it back over the finished subgrade. This method prevents mixing valuable topsoil with less fertile subsoil and ensures a high-quality final surface, avoiding a muddy driveway.

Goal: The instructor explains the importance of preserving the top layer of soil (topsoil) by skimming it off and setting it aside before cutting the subgrade.

What they say

Hide

so alex is gonna use a four in one bucket for the first time and over in Europe they use them all the time you don't see them that much here in America to be honest with you all the job sites have been on I rarely see these things on them

Auto-generated from the video audio.