Preserve Topsoil for Final Grading
At 3:56 in
Noob Tries his hand at Cutting Grade & running his first 4 in 1 bucket -Can he handle it? 4k video
What happens here
The instructor steps out of the machine to explain the concept of different soil layers: topsoil (referred to as the 'top coat' or 'top layer') and subsoil (the soil underneath). He emphasizes that for this job, it's crucial to conserve the valuable topsoil, which was previously imported. The plan is to skim off the top 1/8 to 1/4 inch of topsoil, pile it outside the immediate work zone, and then spread it back over the finished subgrade. This method prevents mixing valuable topsoil with less fertile subsoil and ensures a high-quality final surface, avoiding a muddy driveway.
Goal: The instructor explains the importance of preserving the top layer of soil (topsoil) by skimming it off and setting it aside before cutting the subgrade.
What they say
(238 characters)Hide
What they say
(238 characters)Auto-generated from the video audio.