Initial Stone Placement

0:00
0:29
2K views

At 0:00 in

No other way to build this. #engcon #excavator #retainingwall

What happens here

The process begins with the careful placement of the initial large stone slabs. An excavator, fitted with a robust hydraulic grapple attachment, lifts a substantial, irregularly shaped stone from a nearby pile. The operator maneuvers the excavator arm, swinging the stone over the prepared stream bank. The stone is then gently lowered into its designated position, likely onto a prepared base of gravel and geotextile fabric (though not explicitly shown being prepared in this clip, the fabric is visible under existing stones). The grapple maintains a firm grip until the stone is settled, then releases it.

Goal: Establish the base layer of the stone wall

Tools and materials

  • Excavator — Lifting and positioning heavy stone slabs
  • Geotextile Fabric — Separating the gravel base from the native soil, preventing mixing and improving stability
  • Gravel — Creating a stable, well-drained base for the stones
  • Hydraulic Grapple Attachment — Securely gripping and manipulating large, irregular stones
  • Large Natural Stone Slabs Natural Stone — Constructing the retaining wall