Skip to main content

Set Up Docking Test for Both Mowers

3:45
11:50
4.9K views

At 3:45 in

Navimow Sent Their Smallest AND Biggest 2026 Mowers — I Pushed Both Past Their Limits (i2 AWD + X4)

What happens here

To test the reliability of the docking process, set up both the Navimow X4 and Navimow i2 base stations side-by-side in a single patch of ground. Ensure they are far enough apart to prevent signal interference but close enough to be captured by a single camera for observation. Each mower will undergo 10 docking and undocking cycles per day for five consecutive days, totaling 100 cycles to evaluate their ability to reliably return to their base stations.

Goal: Prepare both mowers for a 5-day docking reliability test with 10 cycles per day.

Tools and materials

  • Ground Screws Segway Navimow — Securing both base stations
  • Navimow i2 Base Station Segway Navimow — Docking and charging the i2 mower
  • Navimow X4 Base Station Segway Navimow — Docking and charging the X4 mower