Drive to and Assess Second Problem Area
At 12:12 in
My John Deer Horror Story | Working the Deere today on the Farm!
What happens here
After successfully clearing the first pipe, the operator retracts the backhoe and drives the tractor along a gravel path. He proceeds through a wooded area, opening and closing a gate, to reach a second problem location. This area features a pond with another pipe that is clogged, causing water to bypass the pipe and create significant erosion along the adjacent road. The operator highlights the 'mushy, nasty marsh' that has formed and the need to redirect the water back into the pipe. The video shows the before and after of this area, confirming the pipe was cleared, but the actual digging process is not shown.
Goal: Transport the backhoe to the second site and assess the pond pipe and erosion.
Tools and materials
- Metal Gate — Controlling access to the work area