What happens here

In the event of a failure in the primary service (MEP-1), the Kirk Key is used to transfer power. The key from the de-energized MEP-1 breaker would be inserted into the MEP-2 interlock, allowing MEP-2 to be switched on. The electrician also highlights a 'tie breaker' which enables both services to run concurrently if the system requires additional load capacity, for example, during peak demand or maintenance. This allows for flexible power management while maintaining safety.

Goal: Learn how redundant services are switched and combined using safety interlocks and tie breakers.

Tools and materials

  • Kirk Key Interlock System — Activating the backup electrical service
  • Tie Breaker — Allowing both electrical services to run simultaneously for increased capacity

What they say

Hide

one off, removing the key, coming over here, and put that key in here, and then we can turn We can See, right now you can't turn it on. See, this is in the way. Yeah. That's in the way. So, we need to retract this with a key. Oh. So, it's it's like it's kind of like common sense, yeah, but this prevents you from turning both services on. If we overload the system, we have the ability to run both with this tie breaker. Oh, I see. Okay. This is a tie breaker, okay? So, the power comes in here to the bus, to this breaker, and feeds this side. Okay. If we had a lot of load and we needed both services on, we would open this up. Okay. And that's why this has the key. We would We could turn this off and then turn on, this key would come out, and then we could use the key to