What happens here
In the event of a failure in the primary service (MEP-1), the Kirk Key is used to transfer power. The key from the de-energized MEP-1 breaker would be inserted into the MEP-2 interlock, allowing MEP-2 to be switched on. The electrician also highlights a 'tie breaker' which enables both services to run concurrently if the system requires additional load capacity, for example, during peak demand or maintenance. This allows for flexible power management while maintaining safety.
Goal: Learn how redundant services are switched and combined using safety interlocks and tie breakers.
Tools and materials
- Kirk Key Interlock System — Activating the backup electrical service
- Tie Breaker — Allowing both electrical services to run simultaneously for increased capacity