Line Trench with Geotextile Fabric
5:57
14:34
38.2K views
At 5:57 in
Muddy, Messy French Drain
What happens here
After the trench is fully excavated, a heavy-duty geotextile fabric is unrolled and laid along the bottom and sides of the trench. The fabric should be wide enough to completely line the trench and allow for overlapping coverage over the pipes later. This fabric prevents soil and sediment from entering and clogging the perforated pipe while still allowing water to pass through.
Goal: Line the newly dug trench with geotextile fabric to prevent clogging of the drainage system while allowing water to infiltrate.
Tools and materials
- Geotextile Fabric
What they say
(235 characters)Hide
What they say
(235 characters)Auto-generated from the video audio.