Material Delivery and Roof Deck Preparation
0:00
0:35
3.6K views
At 0:00 in
Low pitch? No problem! Go with metal!
What happens here
The video begins with the preparation phase where workers are positioned on the roof deck. A synthetic underlayment, specifically 'Titanium PSU 30', is already installed across the entire surface. One worker on a ladder carefully passes a long, pre-fabricated metal roofing panel up to another worker on the roof. This process ensures that materials are safely and efficiently transferred to the working area.
Goal: Safely transfer roofing panels to the roof deck and ensure underlayment is in place.
Tools and materials
- Ladder — Accessing the roof and safely transferring materials
- Metal Roofing Panels — The primary roofing material being installed
- Safety Harness — Ensuring worker safety while working at heights
- Synthetic Underlayment Titanium PSU 30 — A waterproof layer beneath the metal panels to protect the roof deck