Initial Excavation and Soil Management
2:24
33:49
16.5K views
At 2:24 in
Live in the excavator working on a farm pond!
What happens here
The excavator begins the digging process, creating an initial basin for the pond. As soil is removed, it is sorted into two distinct piles. One pile consists of "good clean dirt," which will be used for constructing the dam. The other pile contains "not so clean dirt," which may include debris and rocks, intended for other uses. The creator notes that the pond is spring-fed, originating from an old spring on the property.
Goal: Begin digging the pond basin and separate usable soil from debris.
Tools and materials
- Excavator Case — Digging and moving soil
- Good Clean Dirt N/A — Constructing the dam
- Not So Clean Dirt N/A — Other land management purposes