Remove Drill Pipe and Install Well Casing

13:29
19:30
31.4K views

At 13:29 in

Live drilling a WELL!

What happens here

The drilling rig is powered down, and the drilling stops. Workers begin the process of uncoupling and removing the drill pipe sections. This involves clamping the pipe, unscrewing sections, and hoisting them away from the well bore. The first section of white PVC well casing is also introduced and carefully lowered into the ground.

Goal: Retrieve drilling tools and begin installing the permanent well casing.

Tools and materials

  • Drill Pipe Sections — Being removed from the well
  • Drilling Rig Correll's Well & Pump — Removing drill pipe and assisting with casing installation
  • PVC Well Casing — Lining the well bore to prevent collapse and contamination