Build the Integrated Steps and Landings
0:13
0:32
3K views
At 0:13 in
like it was always supposed to be
What happens here
With the central planter structure in place, proceed to build the integrated steps and landings for both back doors, connecting them to the planter and the main patio. As suggested by the video, these steps can also be constructed using a block system like Unilock U-Cara for the risers. Carefully stack and secure the blocks, ensuring that each step has a consistent rise (height) and run (depth) for safety and aesthetics. The landings at the top of the steps should be perfectly level and align with the door thresholds. Use string lines and a level to maintain accuracy throughout the build.
Goal: Construct the main step structure for both back doors, integrating them with the central planter.
Tools and materials
- Concrete Saw — Cutting blocks for precise fit
- Level — Checking level and plumb of blocks
- Rubber Mallet — Tapping blocks into place
- Safety Glasses — Eye protection
- String Line — Guiding straightness and elevation
- Work Gloves — Hand protection
- Landscape Adhesive — Securing the U-Cara blocks
- Unilock U-Cara Blocks Unilock — Constructing the step risers and possibly parts of the landings