Skip to main content

Install Horizontal Drainage System

6:03
8:43
892.1K views

At 6:03 in

Landscape, Construction Management Disaster turns Into a Mud/ LandSlide

What happens here

Behind the newly constructed boulder retaining wall, install a horizontal drainage system. This typically involves laying more landscape fabric, placing perforated drainage pipe, and backfilling with gravel. This system should connect to the vertical chimney drains to effectively collect and channel water that has permeated through the hillside, providing an outlet to safely discharge it away from the slope's base and the house foundation. This prevents hydrostatic pressure from building up behind the retaining wall, which could lead to failure.

Goal: Provide an outlet for collected water at the base of the slope.

Tools and materials

  • Level Various — Checking the grade of the drainage pipe
  • Safety Gloves Various — Hand protection
  • Shovels Various — Placing gravel and pipe
  • Utility Knife Various — Cutting landscape fabric
  • Wheelbarrow Various — Transporting gravel
  • Landscape Fabric — Lining the drain trench to prevent soil infiltration
  • Perforated Drainage Pipe Various — Collecting and channeling water
  • Washed Gravel or Crushed Stone Various — Backfilling the horizontal drain

What they say

Hide

more just structurally to to allow us to alter the pitch of this hill so that we can get a a slighter angle, easier maintenance for the customer. And we installed a horizontal drainage system behind those boulder retaining walls, so as the water was coming through the hill, it would hit that drainage system and give it an outlet. But, here's the problem. The customer had maxed out their budget on the initial design of this project. So, now I have a design

Auto-generated from the video audio.