Skip to main content

Prepare the Hydraulic Jack

0:20
1:10
5.5K views

At 0:20 in

Krack Hog Stone and Paver Splitter #equipexpo #tools #diy

What happens here

Before beginning to split, locate the jack handle on the side of the machine. Turn this handle to the right (clockwise) to close the internal jack, ensuring it is in the fully locked position. This prepares the hydraulic system to apply pressure upwards.

Goal: Ensure the hydraulic jack is closed and ready for operation.