Skip to main content

Laying Down New Asphalt Millings

0:34
0:39
2K views

At 0:34 in

Keeping fresh.

What happens here

After the old, mud-caked millings have been successfully scraped away, the next step, as outlined in the project plan, is to bring in and spread new asphalt millings across the prepared surface of the parking lot. The dozer would likely be used to evenly distribute and level these new millings, providing a fresh, cleaner, and more durable surface for the commercial yard.

Goal: Install a new, clean surface for the parking lot.

Tools and materials

  • Dozer — Spreading and leveling the new asphalt millings
  • New Asphalt Millings N/A — The fresh material to create the new parking lot surface