Appliance Rough-in and Initial Installation
At 0:10 in
Just about everything but the countertop 
What happens here
Within the newly constructed block framework, specific openings are prepared and some appliance components are partially installed. The video highlights stainless steel drawers and a warming drawer, which are either already integrated into the structure or have their housings rough-in and covered for protection. This stage involves precise measurements to ensure that all planned outdoor kitchen appliances, such as grills, refrigerators, and storage units, will fit seamlessly once the final finishes are applied. Basic utilities like gas lines and water connections would also be roughed in at this point if required by the appliances.
Goal: Prepare and partially install appliance housings within the kitchen structure.
Tools and materials
- Fasteners/Screws — Securing appliance housings in place
- Level — Ensuring appliances are installed plumb and level
- Measuring Tape — Accurately sizing appliance openings
- Plastic Sheeting/Covers — Protecting installed appliances during the rough-in phase
- Shims — Adjusting appliance height and leveling
- Stainless Steel Drawers — Storage within the outdoor kitchen
- Warming Drawer — Keeping food warm