Skip to main content

Lowering and Final Placement

0:37
0:46
749 views

At 0:37 in

just a lil guy

What happens here

With extreme precision, the excavator slowly and carefully lowers the plunge pool shell into the prepared gravel base. The ground crew actively assists, making minor adjustments to the pool's position and rotation as it descends. They ensure the pool settles perfectly level and centered within the excavation, aligning any pre-plumbed pipes with future underground connections. The video ends with the pool fully seated in its hole, ready for backfilling and further connections.

Goal: Precisely lower the pool into the excavation and ensure it is level and correctly oriented.

Tools and materials

  • Heavy-duty Lifting Straps — Supporting the pool during lowering
  • Kubota KX057-5 Excavator Kubota — Lowering the pool shell
  • Spirit Level — Checking the pool's levelness from multiple points (implied)
  • Pre-fabricated Plunge Pool Shell — The pool being installed