Skip to main content

Initial Site Assessment & Floor Protection

0:56
9:35
70.4K views

At 0:56 in

Jobsite SEQUENCING. What To Paint FIRST?

What happens here

Start by having the project lead or an experienced team member meet with the client to discuss the day's painting plan. Immediately after, begin bringing in and strategically laying down drop cloths from the entry of the house to all areas where work will be conducted. This creates protected pathways and secures the main work zone floors before any tools are brought in or heavy traffic begins. Ensure the drop cloths are 'leak-proof' for maximum protection.

Goal: Upon arrival, the team leader communicates with the client about the project scope. Simultaneously, crew members begin laying drop cloths to protect flooring from the entry point to the main work areas.

Tools and materials

  • Leak-proof Drop Cloths

What they say

Hide

ceilings, one color. So, we showed up to the job site today. There's me, you, we've got um foreign language Friday, Lucas hanging out. We've got safety Sally over here uh doing some cutends. And that's what we got. So, we got four people here today. Four people. We showed up at the door and what was the first thing we do to get this job going, Zach? So, normally, uh either Chris, John, or I will come up. We'll open it up with the the customer and uh we'll just kind of walk through what we're going to be doing that day. And then uh one of the guys will start bringing drop cloths in and they'll they'll start at the doorway and just kind of lead a pathway to a bigger leak proof drop cloth and then that's when we start bringing some of the tools in. So it's very important to get drop cloths down very first thing before you start walking on people's floors and stuff. So, open the doors, we set drop cloths down, start setting tools on the

Auto-generated from the video audio.