Skip to main content

Prepare Site and Install Foundation

0:00
0:24
8.7K views

At 0:00 in

It’s pretty impressive what you can build on top of @goliathtechcorp helical piles !! #shorts

What happens here

The initial step involves preparing the ground for the new patio enclosure. This includes clearing vegetation, leveling the soil using a Bobcat skid-steer loader, and marking out the precise locations for the foundation elements. Subsequently, helical piles are installed into the ground at the marked locations. This process utilizes a specialized hydraulic auger attachment on the skid-steer loader to screw the steel piles deep into the earth, providing a stable and robust foundation for the structure. After installation, the top of each helical pile is cut to the correct height and capped, ready to support the main structure's frame.

Goal: Establish a stable and level foundation for the patio enclosure

Tools and materials

  • Bobcat Skid-Steer Loader Bobcat — Ground leveling and operating the helical pile driver attachment
  • Helical Piles — Creating the deep foundation for the structure
  • Hydraulic Helical Pile Driver Attachment — Screwing helical piles into the ground
  • Marking Paint/Stakes — Layout and marking foundation points