Transport and Position UTV for Installation
0:00
28:44
128.4K views
At 0:00 in
Installing & testing UTV tracks
What happens here
Before beginning the track installation, transport the UTV to a suitable workshop. In the video, the UTV is driven onto a trailer and secured using ratchet straps, then towed to a facility. Once at the facility, the UTV is elevated using a hydraulic lift to provide easy access to the wheel wells and undercarriage for track installation. Ensure the UTV is stable and safely positioned before proceeding with any work.
Goal: Safely prepare the UTV for track installation in a workshop setting.
Tools and materials
- Hydraulic Lift (or Jack Stands)
- Ratchet Straps
- Trailer
What they say
(938 characters)Hide
What they say
(938 characters)Auto-generated from the video audio.