Prepare Shingles for Flashing
2:16
6:47
962.8K views
At 2:16 in
Installing Attic Fan To Cool Down My house
What happens here
After the hole is cut, prepare the surrounding roof shingles for the fan's integrated flashing. Use a pry bar and a hammer to carefully lift the shingles that will be covered by the upper part of the flashing. This involves gently prying up the nails holding these shingles in place. The goal is to create enough space for the fan's flashing to slide underneath these shingles, ensuring a continuous and watertight layer from the fan down to the rest of the roof.
Goal: Lift and prepare the surrounding roof shingles to allow the fan's flashing to slide underneath.
Tools and materials
- Hammer — Assisting with nail removal and shingle prying
- Pry Bar — Lifting shingles and prying nails
What they say
(418 characters)Hide
What they say
(418 characters)Auto-generated from the video audio.