Skip to main content

Prepare Shingles for Flashing

2:16
6:47
962.8K views

At 2:16 in

Installing Attic Fan To Cool Down My house

What happens here

After the hole is cut, prepare the surrounding roof shingles for the fan's integrated flashing. Use a pry bar and a hammer to carefully lift the shingles that will be covered by the upper part of the flashing. This involves gently prying up the nails holding these shingles in place. The goal is to create enough space for the fan's flashing to slide underneath these shingles, ensuring a continuous and watertight layer from the fan down to the rest of the roof.

Goal: Lift and prepare the surrounding roof shingles to allow the fan's flashing to slide underneath.

Tools and materials

  • Hammer — Assisting with nail removal and shingle prying
  • Pry Bar — Lifting shingles and prying nails

What they say

Hide

[Music] all right now that our hole is cut up we're gonna use a pry bar and start prying up around this area the nails that are holding the shingles in place because this puppy is going to slide underneath them you guys roof is not as steep as mine you see the videos like installing like this people got like a flat roof i'm like oh must be nice at us here on this mr builder channel we put our life in danger for you

Auto-generated from the video audio.