Prepare Shower Base and Walls for Flooring
At 2:04 in
Insane Bathroom remodel- How to Build an indoor cave
What happens here
To prepare for the composite decking, the installer uses an angle grinder to cut the edges of the concrete base and the bottom of the irregular, rock-textured walls. This precise cutting ensures that the composite boards can be seamlessly installed up against the uneven surfaces, forming a flush 'picture frame' border around the main shower floor area. Care is taken to follow the natural curves and angles of the molded rock walls.
Goal: The first step in finishing the shower room involves carefully cutting and grinding the existing concrete base and the lower sections of the rock-like walls. This preparation is essential to create a proper fit for the custom composite decking, especially given the irregular contours of the 'cave' walls.
Tools and materials
- Angle Grinder
- Circular Saw
- Drill
- Measuring Tape
- Pencil/Marker
- Safety Glasses
What they say
(602 characters)Hide
What they say
(602 characters)Auto-generated from the video audio.