Prepare Ground and Install Footings

0:00
8:24
3.8M views

At 0:00 in

Incredible Deck With Built in Hot Tub - Full Backyard Makeover Time Lapse

What happens here

The initial phase involves clearing the ground and establishing the foundational support for the deck. Workers are seen using shovels to prepare the soil and placing green-capped concrete pier blocks and pre-cast concrete footings around the perimeter of the future deck area. This ensures a stable and level base for the entire structure.

Goal: Establish a stable and level foundation for the multi-level deck.

Tools and materials

  • Chalk Line — Establishing straight lines for footing alignment
  • Concrete Pier Blocks — Providing primary support for deck posts and beams
  • Level — Ensuring footings are level and at the correct elevation
  • Pre-cast Concrete Footings — Creating a stable base for the deck structure
  • Shovel — Digging and clearing soil for footings
  • Tape Measure — Measuring and marking footing locations