Skip to main content

Install Unilock U-Cara Landscaping Blocks

0:15
0:28
1.8K views

At 0:15 in

ignore the snow…

What happens here

With the railing system in place, the Unilock U-Cara landscaping blocks can now be installed. The video shows workers on their knees, actively positioning and securing the charcoal-colored blocks onto the horizontal rails. The blocks have a unique design that allows them to hook onto the rails from the top, forming continuous, stacked rows. This process continues along the entire bottom perimeter of the building, including around corners, creating a continuous stone facade. The final step, mentioned but not shown, will involve adding a ledgestone coping on top of the installed blocks for a finished look.

Goal: Attach the charcoal-colored Unilock U-Cara blocks to the installed railing system to create the building facade.

Tools and materials

  • Metal Railing System Unilock — To hold the landscaping blocks in place
  • Safety Glasses — Eye protection, especially if blocks need cutting
  • Safety Gloves — Protecting hands during block handling
  • Wet Saw
  • Ledgestone Coping Unilock — To finish the top edge of the installed block facade