Obtain Permits and Install Footings
At 7:25 in
"Idiot Proof" Do it Yourself Deck Build - Step by Step Guide to Composite decks pt1
What happens here
Before installing footings, it's essential to consult with a local building inspector to understand permit requirements. For a deck detached from the house and less than 30 inches above grade, a permit might not be needed. However, if the deck is attached or in front of an egress door, or if deep frost footings are required, a permit will likely be necessary. Despite the deck being detached and not technically requiring frost footings, the team chose to install 42-46 inch deep frost footings with concrete bottoms for added stability, using a skid steer with an auger attachment for efficient hole digging. Concrete is then poured into the bottom of each hole to create a solid base.
Goal: Secure necessary permits and install a robust foundation for the deck.
Tools and materials
- Auger Attachment Bobcat — Drilling deep holes for footings, Buckets Unknown
- Concrete Mix — Creating a solid base in each footing hole
What they say
(1,486 characters)Hide
What they say
(1,486 characters)Auto-generated from the video audio.