Skip to main content

Conclusion: Review of Red Flags and Value

18:43
23:05
101.1K views

At 18:43 in

I Wouldn't Buy This Equipment... Here's Why

What happens here

The presenter summarizes the 'red flags' from the PJ Trailers dump trailer evaluation. Red Flag #1 was the indented sidewalls ('Monster Rails'), which, while adding rigidity, don't form a fully enclosed box frame. He emphasizes that the top rail is a critical impact point where debris hits and less skilled operators might cause damage. He believes a completely boxed-in frame, despite adding weight and reducing carrying capacity, would be a superior design for durability. Red Flag #2 was the 7,000-pound axles, which he deems insufficient given the robust 'Monster Rails' and the likelihood of contractors overloading the trailer. He suggests that PJ Trailers should offer 8,000-pound or 10,000-pound axles as an option, or down-rate the trailer's perceived capacity. Red Flag #3 was the sloppy welds, which he views as a clear sign of compromised craftsmanship. He concludes by stating that while PJ is a well-known mid-tier brand, buyers should be aware of these compromises and not equate brand recognition with automatic top-tier quality, ensuring they get appropriate value for their investment.

Goal: Summarize critical design flaws and emphasize making informed purchasing decisions.

What they say

Hide

>> Have a good one now. >> Okay, let's get technical on this one. Red flag number one was those that box frame side, the indentation. And I just seen the opportunity for those guys to completely create a box frame which would have immensely strengthened those sidewalls because that top rail, that monster rail that they're bragging about, that is the crash point on a dump trailer. That's the point where all of the debris hits. That's where if you have um less skilled operators, they're banging into it, they're hitting it from the sides, they're dropping stuff on the top. The boom arms on the equipment are coming down and smashing it. It is a smash point. And I love the fact that they at least took the time to create that indentation to strengthen it. But if they completely box that in, it would have added weight, which would have reduced carrying capacity. But that's one of those critical stages in the build of a trailer where you just shouldn't compromise. It is a point where it's going to get impacted a lot. So, that was red flag number one. Now, red flag one builds off from red flag number two. Those 7,000-lb axles don't scare me on a typical dump trailer. But they have the monster rails on that dump trailer, which tells me the mental attitude of guys is going to be it's a bigger trailer, fill it up. I've been in this industry for over 35 years. I know that's the way guys think. I know that's the way guys operate. Put it all in. It's got the monster rails. But you're putting it all in on top of 7,000-lb axles. You could have easily bumped those axles up to 8,000-lb axles or 10,000-lb axles, and then down rated the trailer. That puts just a beefier framework underneath that trailer. That's where the rubber meets the road. Those axles are a critical failure point. And those axles, when you got a heavy trailer and it's being drug behind and it's going off-road, when you're especially when you're dumping, that's a point where I really think you could have at least given the option to contractors to beef up those axles. You've got beefy sides on it, and then you've got weak axles underneath it. That's a problem that is just waiting to happen. Now, red flag number three, I just couldn't keep my mouth shut. Those welds, I don't know who who What company would put welds like that out there? I mean, you you just don't do that. You don't You It's right where people are seeing it. And so you guys, when you're looking at these trailers, do the just uh…

Auto-generated from the video audio.