Ground Preparation and Base Installation
6:30
57:32
143.4K views
At 6:30 in
I Built the Ultimate Open-Concept Patio for Entertaining
What happens here
After initial demolition, use a stump grinder to remove the remaining tree stumps below ground level. This prepares the soil for subsequent leveling and construction. Following this, use a mini skid steer loader to level the ground, spread road mix as a base, and remove any remaining debris or old concrete pavers. Finally, lay paver sand for precise leveling before installing the new patio pavers. Compact the road mix with a tamper for a stable foundation.
Goal: Create a level and stable base for the new patio pavers.
Tools and materials
- Broom — Sweeping and fine-tuning ground level
- Mini Skid Steer Loader Ditch Witch SK800 — Leveling ground, spreading road mix, and moving debris
- Shovel — Manual ground work and debris removal
- Stump Grinder Ditch Witch SK800 — Removing tree stumps below ground level
- Tamper — Compacting the road mix base
- Paver Sand — Providing a level and uniform surface for paver installation
- Road Mix — Creating a stable base layer under the pavers