Initial Site Assessment & Planning
At 0:05 in
How to Remove a Swimming Pool Wayzata MN
What happens here
The project starts with an initial assessment of the concrete pool to be demolished. This includes identifying the main pool structure, any surrounding concrete elements like a retaining wall, and potentially other structures such as a well house. The area for equipment access (e.g., excavators, skid steers) is identified, and a general plan for demolition is formulated. The narrator specifically mentions the pool itself is a lump sum demolition, while the well house and retaining wall are 'time and material' tasks, indicating separate considerations for these elements. Ensure all electrical connections (like for the diving board) are disconnected.
Goal: Begin by assessing the concrete pool and surrounding structures (retaining wall, well house) to be demolished, noting existing conditions and planning the approach for heavy equipment access and demolition sequence.
Tools and materials
- Bobcat Skid Steer (S185)
- Boloarder (4-foot)
- Excavator
What they say
(802 characters)Hide
What they say
(802 characters)Auto-generated from the video audio.