What happens here

The speaker elaborates on the project's challenge: they need to 'shave off' approximately 1100 cubic yards of soil from the top of the building's underground garage. This is necessary because water is infiltrating the garage, causing damage. He conceptualizes the problem by using his hands to illustrate the garage roof and the soil layer above it, emphasizing the volume of earth that needs to be removed.

Goal: The speaker explains the core problem of water infiltration into the underground parking garage and the extensive work required to fix it.

What they say

Hide

and we're going into a pre-bid meeting on a almost $770,000 commercial project I'm going to take you with me I'm going to take you to the meeting I'm going to walk through you're going to go with me while we meet Engineers while we meet building restoration professionals while we meet contractors okay so this is the courtyard we have a we have well the problem is we have water in infiltration coming into the underground parking facility that is directly below us we're walking on top of it you're going to hear and figure out what the project is which is basically we've got to shave almost a thous actually it's 1,00 cubic yards of soil off from the top of a building garage so there's an underground garage so we are underneath

Auto-generated from the video audio.