What happens here
The speaker elaborates on the project's challenge: they need to 'shave off' approximately 1100 cubic yards of soil from the top of the building's underground garage. This is necessary because water is infiltrating the garage, causing damage. He conceptualizes the problem by using his hands to illustrate the garage roof and the soil layer above it, emphasizing the volume of earth that needs to be removed.
Goal: The speaker explains the core problem of water infiltration into the underground parking garage and the extensive work required to fix it.