Remove Existing Materials & Initial Excavation
At 2:00 in
How to make $2000 Even on a Landscape Design (gone wrong)
What happens here
The initial step in addressing the drainage issue involves removing the existing decorative rock and any plants from the problem area. The subgrade beneath these materials is then exposed and excavated. A critical mistake made during this first attempt was the improper handling of the removed decorative rock; it was allowed to mix with dirt, contaminating it and rendering it unusable for re-installation. This meant new rock had to be purchased, increasing material costs and waste. The existing subgrade was also found to be incorrectly sloped, causing water to continue to pool along the sidewalk edge.
Goal: Clear the area of existing landscaping materials and expose the subgrade for initial assessment.