Fill Pool & Rough Grade Sub-Grade

3:21
7:09
16K views

At 3:21 in

How to Flip a House

What happens here

With the pool shell empty and debris (pool liner, deck timbers, concrete pieces) piled up, the process of filling the void begins. Soil is imported into the empty pool area and compacted to create a stable sub-grade. The mini-excavator and compact track loader are used to move and spread the soil, ensuring proper elevation and drainage. The existing debris (wood, concrete, plastic) is consolidated for hauling away.

Goal: This step involves importing soil to fill the empty pool shell and rough grading the area to create a stable sub-grade. Heavy machinery is used to move, spread, and compact the soil, while all demolition debris is collected for removal.

Tools and materials

  • Bobcat 325 Excavator
  • Bobcat T180 Compact Track Loader
  • Fill Soil

What they say

Hide

do and use this backyard for. Well, we can't seem to get a break from the rain all season long. It just pours on us every two or three days. So, this is uh we've got we're one uh maybe this is two days into this site. One or two, I don't remember which. Uh the pool liner, you can see that's pulled out. All the timbers from the decking material are out. We're starting to bring soil in. You can see where they've got the excavator down on the bottom. So, that obviously has to be compacted already at that elevation. The concrete that you see laying right down there that's getting yanked and set into the pile over here to be hauled out. Um, we've got another load of timbers over here. So, we've got quite a few loads of debris that have to come out on this site and then we can start importing in. So, a lot of times what we do when we're prepping a house to sell, we're going to remove it and prep it and get it set so that the next people come in here have a flat backyard. They can put their they can implement their own ideas and they can just visualize what how they would use it and what they're going to do with their yard. Wrapping this job up in St. Anthony getting the final touches done on the finished grade. This is the subgrade that he's working on right here. And the black dirt is along the fence line going in that will be laid and incorporated into this subgrade. Looks like we replanted the pine tree for them. The customer If you remember, there was a pine tree sitting right in the middle there.