Fill Pool & Rough Grade Sub-Grade
3:21
7:09
16K views
At 3:21 in
How to Flip a House
What happens here
With the pool shell empty and debris (pool liner, deck timbers, concrete pieces) piled up, the process of filling the void begins. Soil is imported into the empty pool area and compacted to create a stable sub-grade. The mini-excavator and compact track loader are used to move and spread the soil, ensuring proper elevation and drainage. The existing debris (wood, concrete, plastic) is consolidated for hauling away.
Goal: This step involves importing soil to fill the empty pool shell and rough grading the area to create a stable sub-grade. Heavy machinery is used to move, spread, and compact the soil, while all demolition debris is collected for removal.
Tools and materials
- Bobcat 325 Excavator
- Bobcat T180 Compact Track Loader
- Fill Soil
What they say
(1,520 characters)Hide
What they say
(1,520 characters)Auto-generated from the video audio.